Kayu Putih Sheet Pile in Pulogadung Repaired
access_time October 02 2019 03:32 PM remove_red_eye 1092
Reported by Nurito | Translated by Nugroho Adibrata
Reported by Nurito | Translated by Nugroho Adibrata
This sheet pile is repaired after being crushed by high water flow
The East Jakarta Water Resources Sub-agency targets to finish the repair of the Kayu Putih connecting channel's sheet Pile, Pulogadung in the forthcoming December. It has been carried out since September 12.
"This sheet pile is repaired after being crushed by high water flow," said East Jakarta Water Resources Sub-agency Head, Santo, Wednesday (10/2).
Sheet Pile Installation on Sentiong River Has Reached 23 PercentTechnically it is done from the Sunter River until Kampung Ambon, Kayu Putih as long as 2.5 kilometers.
To speed up it, three heavy equipments type backhoe for excavating land and 300 personnel have been deployed to the location.
"We use river rocks to repair for long durability," he stated.